Address: 47100 US-18, Davis, SD 57021, USA
Created date: February 28, 2024
Date last updated: August 7, 2024
- The I-29 Ag & Industrial Park offers various lot sizes that provide easy access for incoming/outgoing freight and excellent visibility for general traffic.
- See page 2 Preliminary Development Plan for lot size and pricing
- All internal roadways shown on page 2 are scheduled to be completed Summer 2023
- The park will have street lighting and rural water running up to the lot line. It will be fully built out with 36’ concrete paved roads
- Water provided by South Lincoln County’s Rural Water
- Buyers will be responsible for costs related to installation of their own septic sewer system
- 3-phase power available through Southeastern Electric
- Midcontinent fiber optic network available
- MidAmerican Energy natural gas can be extended to the site
- Covenants and restrictions apply - contact listing agent for details
Property Description
The I-29 Ag & Industrial Park offers various lot sizes that provide easy access for incoming/outgoing freight and excellent visibility for general traffic.
See page 2 Preliminary Development Plan for lot size and pricing
All internal roadways shown on page 2 are scheduled to be completed Summer 2023
The park will have street lighting and rural water running up to the lot line. It will be fully built out with 36’ concrete paved roads
Water provided by South Lincoln County’s Rural Water
Buyers will be responsible for costs related to installation of their own septic sewer system
3-phase power available through Southeastern Electric
Midcontinent fiber optic network available
MidAmerican Energy natural gas can be extended to the site
Covenants and restrictions apply - contact listing agent for details